Kok Gorinchem

Kok Lexmond is operating in many different areas. At the Gorinchem site, they are involved in the storage and transport of various materials. The entire Kok organisation has a sustainable vision and has taken a major steps towards sustainability with their solar installation. For this project, we carried out an extensive analysis of the roof construction to calculate exactly how many solar panels would fit on the roof.

Numbers

The most important project numbers at a glance

  • Solar panels 1,629 x Canadian Solar 410 Wp
  • Annual output 589,955 kWh
  • Location Gorinchem
  • CO2 reduction 353,973 kg per year
  • Maximum output 667,890 Wp
  • EMS EMS