Back to projects

Kruiswijk

For Kruiswijk, we installed a solution that allows them to trade on the energy market and contribute to energy balancing. The system consists of four cabinets totalling 940 kWh (233 kWh per cabinet), and has a capacity of 440 kW.

On behalf of Den Hartog Charging, Generation Greende provided full EPC (Engineering, Procurement, and Construction), including the AC work.

Numbers

The most important project numbers at a glance

  • Location Bergambacht
  • Battery 940 kWh
  • EMS EMS
  • Power 4 x 233 kW

Want to work together?
Get in touch now