De Zoom,
Lexmond

For our client in Lexmond, it all started with the process of applying for a SDE subsidy. Generation Green took over the entire process. And with great success!

After selecting the black panels that the customer found most appealing, we completed an installation with 524 panels. Although the customer uses a lot of energy, the system returns a fair amount of green electricity back into the network.

Numbers

The most important project numbers at a glance

  • Solar panels524 x Jinko Solar 310wp
  • Annual output142,820 kWh
  • LocationLexmond
  • CO2 reduction85,692 kg per year
  • Maximum output162,440 Wp
  • EMSEMS

The client

“With a large operating site, there is a lot of roof space to work with. As our company requires a lot of electricity, we decided to look into ways of generating our own green electricity. That’s how we ended up at Generation Green, and they immediately told us about the possibility of an SDE subsidy. Once we had agreed, they took care of the entire application process.

As the location is very visible and has a large roof, we wanted solar panels that look nice and are not too imposing. Generation Green took our request into account by going through all the options with us and made sure that the construction bars (located between the modules) were the same color as the roof. As a result, the modules blended in very well with the roof making the whole installation look very appealing.

From start to finish, we worked for around six months, in which Generation Green demonstrated quality, arranged the necessary aftercare and took away all our hard work. We are very satisfied!”

“From start to finish, we worked for around six months, in which Generation Green demonstrated quality, arranged the necessary aftercare and took away all our hard work. We are very satisfied!”