Back to projects

DHG Smartlog 9

Generation Green has successfully installed 100,000 m2 of solar panels, distributed on Smartlog 8 and 9. This project generates 11MWp of renewable solar energy, which is equal to the power needs of 3,142 households per year or 300 electric trucks per year.

Numbers

The most important project numbers at a glance

  • Solar panels10.444 x Longi Solar 530 Wp
  • Annual output4.974.200 kWh
  • LocationRotterdam
  • Maximum output5.535.000 Wp
  • EMSEMS

Want to work together?
Get in touch now