Numbers
The most important project numbers at a glance
- Solar panels234 x Jinko Solar 340wp
- Annual output79,288 kWh
- LocationEverdingen
- CO2 reduction47,573 kg per year
- Maximum output79,560 Wp
For the project in Everdingen, we helped realising a net-metering installation. Net-metering means that the self-generated energy is deducted from the bill of the energy supplier. This is a very interesting option when buying solar panels.
To ensure that the installation didn't require too much network connection, we made sure that the solar panels generated enough kWh to meet their target without generating too much power.
The most important project numbers at a glance